Air Conditioning Install Bolting
|
Since the drier and condenser are bolted to each other, it’s possible to install the #6 hard line from the bottom of the condenser to the right side of the drier prior to installing the condenser assembly. Note the use of two wrenches; one to tighten the nut and one to hold the fitting to prevent the fitting from being over tightened, twisted, and damaged. View Related Article
|
|